Excavator pulling down a concrete villa, with rubble across the ground

Mixed construction and demolition waste.

When a site produces a bit of everything, loads go to sorting facilities that recover concrete, metal, wood and cardboard.

04 / 04 Site photo · demolition

Mixed construction & demolition waste

Mixed loads, sorted properly.

When a site produces a bit of everything — rubble, timber, metal, gypsum and packaging — the load goes to a facility that sorts it. Recyclable fractions are recovered; only the rest goes to landfill.

Becomes
Sorted recyclables + residue
Goes to
Sorting / recovery facility
Best as
Non-hazardous mixed waste

Accepted

  • Mixed demolition rubble
  • Timber, pallets and formwork
  • Scrap metal and cables
  • Gypsum board and plaster
  • Packaging, cardboard and plastic from site

Not accepted

  • Asbestos
  • Paints, solvents, oils or chemicals
  • Batteries and electronic waste
  • Medical or household waste
  • Gas cylinders

How it’s recycled

  1. Step 01Weigh in

    The load is checked and weighed at the weighbridge.

  2. Step 02Sort

    Material is sorted by machine and by hand into separate streams.

  3. Step 03Recover

    Concrete, metal, wood and cardboard go to their own recycling routes.

  4. Step 04Dispose of the rest

    Only what cannot be recovered goes to an approved landfill.

What it becomes

  • Recycled aggregate from rubble
  • Scrap metal
  • Wood chips
  • Recycled cardboard and plastic

Prepare your load

  1. 01

    Separate concrete and soil where you can — mixed loads cost more.

  2. 02

    Keep hazardous items like paint tins and batteries out of the skip.

  3. 03

    Flatten packaging to save space.

  4. 04

    Photograph the load before it leaves site.

Questions

Why does mixed waste cost more?

It has to be sorted before it can be recycled, and part of it still ends up in landfill. Separating the big streams on site saves money.

What happens to the part that can’t be recycled?

It goes to an approved landfill. The receipt records the facility and the outcome of each load.

Is hazardous waste accepted?

No. Zero Waste Qatar is for non-hazardous construction and demolition waste only.

What proof do I get?

A weighbridge receipt for every load, with the net weight and a code anyone can verify.

Know roughly how much you have?

Get an instant estimate of trucks and cost, then post the job to get real quotes from verified transporters.